Zuidwestboog Betuweroute Bridge Works, Meteren Live Cam
| Status: | Webcam online |
| Country: | Netherlands |
| Timezone: | GMT+01:00 |
| Tags: | |
| Broadcast last updated: | November 18, 2026 |
| Webcam last checked: | November 18, 2026 |
Weather and time
Construction site of the Zuidwestboog rail curve at Meteren, with a concrete bridge deck taking shape beside the Betuweroute. Workers in orange gear and a mobile crane are visible on and around the deck.
The Zuidwestboog is a new freight rail link between the Betuweroute and the line toward 's-Hertogenbosch, built near Meteren in West Betuwe, Gelderland. Plans include a pergola bridge over the Utrecht to Den Bosch railway and a trough bridge over the A15 and the Betuweroute. Works began in 2022 and are scheduled to finish around 2030.
The camera looks down the works corridor. On the left run the A15 and the Betuweroute tracks, with the cleared strip for the new curve beside them. On the right stand site cabins and solar panels, with wind turbines on the horizon. During the working day the crane and crew move along the deck.